629 cables on one floor, 57,000 feet of shielded Cat6A on the other, and every link documented.

Client
Video game studio and financial group
Location
Downtown Montreal
Date
2024–2026
Timeline
On the general contractor’s schedule

The problem

Two office fit-outs to cable on the general contractor’s schedule, before the ceilings closed, with very different requirements.

The video game studio

A floor with open areas, meeting rooms and four production studios. 629 plenum cables: 586 Cat6 jacks for workstations, 16 Cat6A cables for the studios, 14 for Wi-Fi and 13 for security, plus a fusion-spliced OM5 fibre backbone. 569 links tested and documented.

The financial group

Two entities sharing a floor of a downtown tower. About 57,000 feet of shielded Cat6A cable, plus single-mode (OS2) and multimode (OM4) fibre between floors. A fibre specification change mid-project was priced, approved and completed without extending the contract.

The certification

Every link was certified on a Fluke DSX-8000: 356 links, including 332 copper and 24 fibre strands, all passing. The client receives the full report, link by link.

The result

Two floors where the network simply works: every port numbered, every link documented, ready for 10 gigabit and PoE.

By the numbers

356/356

certified links passed

Services used

Structured cabling and fibreNetworking and Wi-Fi
I have a similar project
Let’s talk about your project

A similar project? Let’s talk for 20 minutes

No sales pitch: you describe your situation, an advisor replies with a concrete recommendation and a price range.

We reply the same business day. Your information stays with HT Solutions (Quebec Law 25).

Other projects

A large flexible room turned into a Microsoft Teams room
Video calls don’t work wellPeople can’t hearBrossard, South Shore

A large flexible room turned into a Microsoft Teams room

A room that joins a Teams meeting in one gesture, with sound that carries to every seat.

on site, training included2 days
Displays, sound and control across three floors of a funeral complex
Screens to managePeople can’t hearLaval

Displays, sound and control across three floors of a funeral complex

17 commercial displays, three sound systems and identical control on every floor.

on three floors, in eleven days17 displays
AV-over-IP video distribution for a customer service centre
Screens to manageNetwork or cablingDowntown Montreal

AV-over-IP video distribution for a customer service centre

More screens on an occupied floor without pulling a single HDMI cable: video travels over the network.

over the network, no HDMI cable4K60
A glass room on four sides, equipped without touching the glass
Video calls don’t work wellArchitectural constraintDowntown Montreal

A glass room on four sides, equipped without touching the glass

From a 3D idea to the finished piece: a custom media unit holds the display, the video bar and the electronics.

in the glass0 holes
Background music under an open ceiling, in a law firm
People can’t hearDowntown Montreal

Background music under an open ceiling, in a law firm

A cafeteria and lounge with no finished ceiling, music that sounds right and is controlled from a phone.

pendant speakers9
Conference rooms and a flexible lounge for a head office
Video calls don’t work wellToo complicated to runSaint-Bruno, South Shore

Conference rooms and a flexible lounge for a head office

Rooms that start the moment people sit down, and a lounge that becomes a presentation venue for the whole company.

to run every room1 interface
Meeting rooms and network for a video game studio’s headquarters
Video calls don’t work wellNetwork or cablingMontreal

Meeting rooms and network for a video game studio’s headquarters

Rooms ready to use, a network nobody has to think about, and shared spaces that bring the whole studio together.

for AV and the network1 integrator
A question about your room?20-min call
Call20-min call