Skip to content
Case study · Downtown Montreal

A glass room on four sides, equipped without touching the glass

From a 3D idea to the finished piece: a custom media unit holds the display, the video bar and the electronics.

Client
Software company
Location
Downtown Montreal
Date
Spring to fall 2026
Timeline
Pilot room in spring, full floor July to October 2026

The problem

The most spectacular room in the new offices was also the hardest to equip: glass on all four sides, no wall to anchor a display or hide a cable.

From 3D idea to reality

The unit started as a 3D concept: a freestanding piece with the display set into the frame, the video bar on a shelf just below and the electronics enclosed in the base. We had it built by our partners, then integrated the 75-inch Samsung commercial display, the Neat video bar and the cabling. Nothing is attached to the glass.

The link to the table

A discreet floor raceway runs along the glazing to the table, where a Kramer table box provides power, USB-C and USB-A for any laptop, with the Neat Pad controller.

The result

Installed as a pilot room in spring 2026, the approach was followed by the rest of the floor’s rooms — huddle rooms, large meeting room, training room and boardroom — between July and October 2026.

Let’s talk about your project

A similar project? Let’s talk for 20 minutes

No sales pitch: you describe your situation, an advisor replies with a concrete recommendation and a price range.

We reply the same business day. Your information stays with HT Solutions (Quebec Law 25).

Other projects

A large flexible room turned into a Microsoft Teams room
Video calls don’t work wellPeople can’t hearBrossard, South Shore

A large flexible room turned into a Microsoft Teams room

A room that joins a Teams meeting in one gesture, with sound that carries to every seat.

on site, training included2 days
Displays, sound and control across three floors of a funeral complex
Screens to managePeople can’t hearLaval

Displays, sound and control across three floors of a funeral complex

17 commercial displays, three sound systems and identical control on every floor.

on three floors, in eleven days17 displays
AV-over-IP video distribution for a customer service centre
Screens to manageNetwork or cablingDowntown Montreal

AV-over-IP video distribution for a customer service centre

More screens on an occupied floor without pulling a single HDMI cable: video travels over the network.

over the network, no HDMI cable4K60
Background music under an open ceiling, in a law firm
People can’t hearDowntown Montreal

Background music under an open ceiling, in a law firm

A cafeteria and lounge with no finished ceiling, music that sounds right and is controlled from a phone.

pendant speakers9
Network cabling and fibre for two office floors, link by link
Network or cablingDowntown Montreal

Network cabling and fibre for two office floors, link by link

629 cables on one floor, 57,000 feet of shielded Cat6A on the other, and every link documented.

certified links passed356/356
Conference rooms and a flexible lounge for a head office
Video calls don’t work wellToo complicated to runSaint-Bruno, South Shore

Conference rooms and a flexible lounge for a head office

Rooms that start the moment people sit down, and a lounge that becomes a presentation venue for the whole company.

to run every room1 interface
Meeting rooms and network for a video game studio’s headquarters
Video calls don’t work wellNetwork or cablingMontreal

Meeting rooms and network for a video game studio’s headquarters

Rooms ready to use, a network nobody has to think about, and shared spaces that bring the whole studio together.

for AV and the network1 integrator
A question about your room?20-min call
Call20-min call