Certified cabling, link by link, on your construction schedule
Copper and fibre installed, labelled and tested before the ceilings close. You receive the report for every link.
Signs it’s time to act
Every system we install runs over cable, and cable is where shortcuts come back to cost you. Our structured cabling delivers clean, standards-compliant infrastructure ready for what comes next.
Labelled, tested, documented: two years from now, nobody has to guess what runs where.
What you gain
- Installation to recognized standards
- Every link labelled, tested and certified
- Copper and fibre, inside and between floors
- Racks that stay easy to service
- Capacity planned for growth
Network cabling and fibre for two office floors, link by link
- Problem
- Two office fit-outs to cable on the general contractor’s schedule, before the ceilings closed, with very different requirements.
- Solution
- Cat6 and shielded Cat6A, OM5, OS2 and OM4 fibre, labelled panels, Fluke DSX-8000 certification and the full report handed to the client.
- Timeline
- On the general contractor’s schedule
What’s included
Brands we install: Belden · CommScope · Panduit · Leviton
Four steps, one accountable team
20-minute call
You describe the room and what isn't working. We tell you honestly whether we can help, with a first price range.
Site visit and plan
On-site survey, plan and elevation drawings, and a detailed quote room by room. No surprises on the invoice.
Installation
Our own technicians and cabling, on your schedule — evenings included, so your rooms stay available.
Training and support
Hands-on training for your team, full documentation, then a single number to call afterwards.
Book a site visit: let’s talk for 20 minutes
No sales pitch: you describe your situation, an advisor replies with a concrete recommendation and a price range.
- 1 877 919-5757or 438-804-5757
- info@htsolutions.casame-business-day reply
- BouchervilleGreater Montreal, South Shore, Laval, across Quebec and in Ontario
- Monday to Friday8 a.m. to 5 p.m.
Frequently asked questions
Do you work for the general contractor?
Often, yes. We follow their schedule and price specification changes as they come up.
What does the certification report contain?
The result of every link tested on a Fluke tester, identified by jack number. On a recent floor, 356 out of 356 links passed.
Do you handle small additions after move-in?
Yes: jack moves, new workstations, new power poles.
Often combined with
Meeting rooms and video conferencing
“Our Teams meetings always start late.”
One-touch join, clear picture and sound for remote participants, on Teams, Zoom or Meet.
Assess my room →
Audio-video integration
“We have good equipment, but nothing talks to each other.”
Displays, audio, sources and control brought together as one documented system, from a single room to a whole building.
Book a free site visit →
Digital signage
“Updating our screens takes half a day.”
Commercial displays and scheduled content from one place, no USB sticks and no walking floor to floor.
Scope my screen network →